site excecho

site excecho

site excecho

PROJECT DESCRIPTION

PROJECT DETAILS
Client: Al , Khandawi Contracting Company
Date: 2017 March
 Location: Khartoum – Obeid Stamp Street
 Category: waterproofing
 
اكسيكو1
اكسيكو2
اكسيكو3
اكسيكو4

the location of Excecho is obeid khatim -ALriyad, the contractor al-Khandawi Contracting and Consultant Company Murtadat Moaz Consulting Company

 

 
Tappco Oil Factory

Tappco Oil Factory

Tappco Oil Factory

PROJECT DESCRIPTION

PROJECT DETAILS
Client: Tappco oil factory
Date: 2013
Location: Khartoum Bahry – Sudan
 Category: Thermal Insulation System,waterproofing
t1
t3
t4
t2

Spray Polyurethane foam for heat insulation had been applied over the metal roof

 
Al-Difaf Towers

Al-Difaf Towers

Al-Difaf Towers

PROJECT DESCRIPTION

PROJECT DETAILS
Client: Palace Hotel
Date: June 2013
Location: Khartoum Bahry – Sudan
 Category: waterproofing
 
d1
d2
d3
d4

Al-Difaf Towers , two towers consist of twenty three floors located in Khartoum north by the river side; the waterproofing system was the most critical issue so the system was carried out as two layers of bituminous membrane 4mm thickness protected by board (Cartonal) 3mm Thick.

 
Dubai Food Industries Factory

Dubai Food Industries Factory

Dubai Food Industries Factory

PROJECT DESCRIPTION

PROJECT DETAILS

Client: Dubai food factory

Date: 2008
Location: Khartoum Bahry – Sudan
Category: Industrial Floors
y1
y2
Dubai Food Industries Factory
y2

Located at Khartoum Bahry, an epoxy flooring system is required for the production,procceing and store area .
Using Sika floor 264 top coat and Sika floor 161 primer
.